HAKI GOES LARGE-SCALE WITH TEMPORARY ROOF FOR XERVON PROJECT
XERVON required scaffolding to cover 4500m² and a temporary roof to cover 2200m², while new apartments were being built on the roof of an existing building.
Despite challenging foundations, XERVON designed a safe method of construction using the HAKI Universal system and a HAKITEC 750 temporary roof.
The large-scale roof was 15m in width, 113m in length and was a height of 24m.
By selecting HAKI, XERVON achieved excellent working conditions, reduced sick leave and reliable progress with the project.
Universal, System Scaffold2019